GE
V
OLUSON
i / V
OLUSON
e
D
IRECTION
KTI106052, R
EVISION
10
S
ERVICE
M
ANUAL
Chapter 3 - Setup Instructions
3-31
3-5-2-2
Installation of the Probe Mux Box
1.) Remove the Probe Holder or the Top Probe Holder.
2.) Loosen (don’t remove) the 2 screws (bottom right side of the top shelf) that hold the RIC Probe
Holder and slide the holder as far out as you can to the right. Re-tighten screws.
3.) Fasten the Box on the Dock Cart with the 3 screws.
4.) Push the probe connector into the probe socket of the Voluson i / Voluson e and lift the
locking lever upwards to lock the probe connector.
5.) Remount the RIC Probe Holder or the Top Probe Holder.
Figure 3-30 Remove the Probe Holder / Top Probe Holder
Figure 3-31 Fasten the Probe Mux Box
screw 1 Allen screw
screw 2 screws
Содержание Voluson i BT06
Страница 2: ......
Страница 11: ...GE VOLUSON i VOLUSON e DIRECTION KTI106052 REVISION 10 SERVICE MANUAL ix ZH CN KO...
Страница 44: ...GE VOLUSON i VOLUSON e DIRECTION KTI106052 REVISION 10 SERVICE MANUAL xlii Table of Contents...
Страница 514: ...GE VOLUSON i VOLUSON e DIRECTION KTI106052 REVISION 10 SERVICE MANUAL IV Index...
Страница 515: ......