GE
P
ART
N
UMBER
FN091065, R
EVISION
2
VS5 N
AND
VS6 N
S
ERVICE
M
ANUAL
Chapter 7 - Diagnostics/Troubleshooting
7-125
P R E L I M I N A R Y
7-6-1 Accessing the Back End Diagnostic Test Options
•
Yellow:
The tests executed so far on these components have passed, but not all
recommended tests have been performed.
5.) At any stage, trackball to the
Pause
button and press
Set
, if required.
6.) To resume testing (from the point where you paused), trackball to the
Start
button and press
Set
.
When the Full Memory Test sequence is complete:
-
the
Diagnostic
Test
window displays the Finished message
-
the View Test Log window opens automatically, listing all tests performed and showing details
of which tests and sub-tests passed or failed, as shown in the example in
Test Log - Full Memory Test" on page 7-125
.
NOTE:
For the Full Memory Test, several tests are performed in the test sequence; these are listed in
the Tests window as shown in
Figure 7-86 "View Test Log - Full Memory Test" on page 7-125
.
For each currently-selected test (for example, Memory Pattern Test) the corresponding report
is listed in Reports on the right.
7.) Use the scroll bars and/or arrows to scroll through the list of
Test
results and review the reports, as
required:
-
Memory Pattern Test
-
Memory Parity Test
8) When done, trackball to the
Exit
button and press
Set
to close the View Report window.
9) After reviewing the test results, proceed as follows:
•
If no problems were identified, it is recommended to re-boot the system (this is obligatory when
prompted).
•
If no problems were identified but the problem persists, contact your local GE HEALTHCARE
field engineer for assistance.
•
If errors were identified and the results were not marginal, verify that all system cables and
boards are connected (not misplaced) and functioning properly, as described in
Components and Function (Theory)
If the problem persists, this indicates that either the specific board you tested is faulty or that
another board that supports the operation of this board is faulty. Contact your local
GE HEALTHCARE field engineer for assistance.
10.)Trackball to the
Exit
button and press
Set
to close the
View Test Log
dialog box.
11.)Press the <
Esc
> button on the keyboard to close the Diagnostic
Test Window
.
Figure 7-86 View Test Log - Full Memory Test
Содержание Vivid S5 N
Страница 2: ......
Страница 4: ...GE PART NUMBER FN091065 REVISION 2 VS5 N AND VS6 N SERVICE MANUAL ii P R E L I M I N A R Y ...
Страница 5: ...GE PART NUMBER FN091065 REVISION 2 VS5 N AND VS6 N SERVICE MANUAL iii P R E L I M I N A R Y ...
Страница 6: ...GE PART NUMBER FN091065 REVISION 2 VS5 N AND VS6 N SERVICE MANUAL iv P R E L I M I N A R Y ...
Страница 7: ...GE PART NUMBER FN091065 REVISION 2 VS5 N AND VS6 N SERVICE MANUAL v P R E L I M I N A R Y ...
Страница 8: ...GE PART NUMBER FN091065 REVISION 2 VS5 N AND VS6 N SERVICE MANUAL vi P R E L I M I N A R Y ...
Страница 9: ...GE PART NUMBER FN091065 REVISION 2 VS5 N AND VS6 N SERVICE MANUAL vii P R E L I M I N A R Y ...
Страница 10: ...GE PART NUMBER FN091065 REVISION 2 VS5 N AND VS6 N SERVICE MANUAL viii P R E L I M I N A R Y ...
Страница 11: ...GE PART NUMBER FN091065 REVISION 2 VS5 N AND VS6 N SERVICE MANUAL ix P R E L I M I N A R Y ...
Страница 12: ...GE PART NUMBER FN091065 REVISION 2 VS5 N AND VS6 N SERVICE MANUAL x P R E L I M I N A R Y ...
Страница 13: ...GE PART NUMBER FN091065 REVISION 2 VS5 N AND VS6 N SERVICE MANUAL xi P R E L I M I N A R Y ...
Страница 14: ...GE PART NUMBER FN091065 REVISION 2 VS5 N AND VS6 N SERVICE MANUAL xii P R E L I M I N A R Y ...
Страница 833: ......
Страница 834: ... 2013 and 2015 General Electric Company GE Vingmed Ultrasound AS P O Box 141 NO 3191 HORTEN NORWAY www gehealthcare com ...