Installation and commissioning
multi N/C pharma HT
40
NOTICE
Damage to the electronics due to condensation
Condensation and temperature differences may damage the device electronics during
commissioning.
¡
Allow the device to acclimatize for at least one hour after positioning it in the oper-
ating room before commissioning.
}
Connect the connection cable to the mains power connection on the rear of the ana-
lyzer.
}
Connect the power plug to a grounded power outlet.
}
Do not switch the device on yet.
Connecting the gases
You are responsible for the gas supply in the laboratory. Ensure that the inlet pressure
on the pressure reducer is set between 400 to 600 kPa.
}
Connect the carrier gas. To do this, connect the supplied connection hose to the pres-
sure reducer of the gas supply.
}
Connect the carrier gas hose to the "O
2
/Air" gas connection on the rear of the device.
– To do this, insert the hose in the quick-release connector.
– To release the hose again later, press the red ring back and pull the hose out of
the connection.
Connecting accessories
WARNING
Risk of chemical burns from concentrated acids
Concentrated acids are highly corrosive and sometimes have an oxidizing effect.
¡
Wear safety goggles and protective clothing when handling concentrated acids.
Work under an extractor.
¡
Observe all instructions and specifications in the safety data sheets.
Connect the reagent bottle and accessory components as follows:
}
Connect the waste hose to the "waste" connection on the rear of the analyzer. Put the
free hose end in a suitable waste container.
}
Open the front doors on the analyzer.
}
Fill the reagent bottle with phosphoric acid (10 %). Put the bottle with the drip tray
into the analyzer.
}
Connect hoses 4 and AC to the reagent bottle with phosphoric acid.
ü
The analyzer has been commissioned.