Installation and commissioning
multi N/C pharma HT
38
The device may only be set up, installed and repaired by the customer service depart-
ment of Analytik Jena GmbH or by persons authorized by Analytik Jena GmbH.
When installing and commissioning your device, observe the information in the "Safety
instructions" section. Compliance with these safety instructions is a requirement for the
error-free installation and the proper functioning of your measuring station. Observe all
warnings and instructions that are attached to the device itself or displayed by the con-
trol and analysis program.
To ensure trouble-free operation, please make sure that the installation conditions are
observed.
4.2.1
Installing and commissioning the analyzer
After initial commissioning, you may want to transport the device again, or store it. You
can recommission the analyzer as described below. Analytik Jena always recommends
installation via customer service.
}
Carefully remove the basic device, the accessories and the supplementary device
from the transport packaging. Retain the transport packaging for future transport.
}
Place the analyzer at its intended location.
}
Remove the adhesive tape from the doors and side walls.
}
Remove the adhesive tape from the top cover. Remove the top cover.
}
Open the left side wall:
– Unscrew the four attachment screws. The screws are captive and remain attached
to the wall.
– Remove the protective grounding. Set the side wall aside safely.
}
Remove all remaining adhesive tape and protective bags.
}
Install the combustion furnace.
}
Mount the condensation coil in the device interior.
}
Fill the combustion tube. Insert the combustion tube into the combustion furnace.
}
Close the left side wall of the analyzer again:
– Attach the protective grounding to the side wall.
– First screw in the screws on the bottom side and then on the top side. Tighten the
screws in turns.
}
Open the front doors.
}
Install the halogen trap and the water traps.
}
Mount the TIC condensate container on the front side.
}
Connect the canulas with hoses AA and 7. Tighten the Fingertight connections fin-
ger-tight.
}
Reapply the top furnace cover.
}
Put the reagent bottle with the drip tray into the analyzer.
}
Close the doors of the analyzer.
ü
The device has been installed.
See also
2