Maintenance and care
multi N/C pharma HT
98
Installation
}
Slide hose 1 into the FAST connector.
}
Slide the FAST connector onto the glass connection of the condensation
coil.
}
Mount the condensation coil in the holder on the side of the furnace. The
spherical joint of the coil points toward the lower opening of the furnace.
}
Connect the lower end of the combustion tube and the inlet of the con-
densation coil via the spherical joint connection (1).
}
Secure the spherical joint connection with the forked clamp (2). Tighten
the knurled head screw (3) hand-tight.
}
Close the side wall.
– Connect the protective grounding to the left side wall.
– Slightly tighten the screws first on the bottom side and then on the
top side. Tighten the screws in turns.
}
Open the gas supply. Connect the power plug with the socket and switch
on the analyzer via the main switch.
}
Check the system for leaks.
ü
The analyzer is ready for operation again.
6.11 Replacing the water traps
Replace the water traps dependent on the sample matrix, but no later than after 6
months.
The water traps consist of a prefilter and a disposable retention filter. Always replace
both water traps. Observe that the water traps only function properly if they are in-
stalled in the correct order and direction.
Check the system for leaks after replacing the water traps.
Water traps on the front side
You can replace the water traps on the front side while the device is switched on, but not
during a measurement.