9. Put the adapter on the flange.
Ensure that the guide pins on the flange fit the holes at the bottom of the adapter.
*
+
,
,
-
. .
'
)
(
'
&
%
$
A. Four M10 screws
B. Bracket
C. Groove
D. Mark
E. Flange
F. Ball valve
G. Pressure transmitter
H. Adapter
I. Entry for pressure transmitter
J. Closing
K. Holes for guide pins
10. Ensure that the mark on top of the adapter aligns with the mark on the closing.
11. Mount the bracket and the pressure transmitter.
12. Tighten the four M10 screws with washers.
13. Connect the pipe at the pressure transmitter input to the entry on the flange and
tighten the nut.
14. Put the Rosemount 5900S radar gauge on the adapter. Ensure that the guide pin
inside the waveguide of the radar gauge fits the groove on the adapter. The
direction of the Verification Pin is indicated by marks on the still-pipe flange and the
closing. See
(The second groove on the adapter is used for measurement verification when
replacing a TankRadar Rex level gauge with a Rosemount 5900S).
Installation
Reference Manual
September 2019
00809-0100-5900
74
Reference Manual
Содержание Rosemount 5900S Series
Страница 1: ...Reference Manual 00809 0100 5900 Rev EA September 2019 Rosemount 5900S Radar Level Gauge ...
Страница 6: ...Contents Reference Manual September 2019 00809 0100 5900 vi Reference Manual ...
Страница 12: ...Introduction Reference Manual September 2019 00809 0100 5900 12 Reference Manual ...
Страница 182: ...Configuration Reference Manual September 2019 00809 0100 5900 182 Reference Manual ...
Страница 186: ...Operation Reference Manual September 2019 00809 0100 5900 186 Reference Manual ...
Страница 222: ...Service and troubleshooting Reference Manual September 2019 00809 0100 5900 222 Reference Manual ...
Страница 266: ...Product Certifications Reference Manual September 2019 00809 0100 5900 266 Reference Manual ...