Verify the gauge measurement
Procedure
1. In the Rosemount
™
TankMaster WinSetup work space, select the
Logical View
tab.
2. Select the icon that represents the desired radar level gauge.
3. Click the right mouse button and select
LPG Setup
to open the
LPG Setup
window:
4. In the
LPG Setup
window, click the
Verify Pins
button to open the
LPG Verify Pins
window.
A. Nominal position
B. Measured position
5. Ensure that the Nominal Position of the Verification Pin appears.
6. In the
LPG Verify Pins
window, click the
Start
button to start the verification process.
When verification is finished, the position measured by the level gauge appears in
the
Measured Position
field.
7. Note the position of the Verification Pin that is presented in the
Measured Position
field.
Configuration
Reference Manual
September 2019
00809-0100-5900
126
Reference Manual
Содержание Rosemount 5900S Series
Страница 1: ...Reference Manual 00809 0100 5900 Rev EA September 2019 Rosemount 5900S Radar Level Gauge ...
Страница 6: ...Contents Reference Manual September 2019 00809 0100 5900 vi Reference Manual ...
Страница 12: ...Introduction Reference Manual September 2019 00809 0100 5900 12 Reference Manual ...
Страница 182: ...Configuration Reference Manual September 2019 00809 0100 5900 182 Reference Manual ...
Страница 186: ...Operation Reference Manual September 2019 00809 0100 5900 186 Reference Manual ...
Страница 222: ...Service and troubleshooting Reference Manual September 2019 00809 0100 5900 222 Reference Manual ...
Страница 266: ...Product Certifications Reference Manual September 2019 00809 0100 5900 266 Reference Manual ...