Service
104
Fig. 88: Chopper
–
Disassemble the plug (1) by removing the two screws (2).
–
The cables (3) of the IR source (4) are then unsoldered from plug (1)
–
Unscrew the nuts (5)
–
Install the new motor (6)
–
The IR source cables (3) are then soldered to the plug (1)
CAUTION
Due to the high current for the infrared cell; it is important that the soldering here is done
accurately, because two pins inside the plug (1) will be soldered together to form one group.
There are two such groups in one plug.
Each end of the IR-source cables (3) will then be soldered to each one of these groups. The
polarity is irrelevant.
–
Afterwards, the chopper blade is refastened.
–
Reassemble in the reverse order.
–
After installing, the infrared cell should be adjusted, see
chapter “
Infrared base line
adjustment
”.
Pos : 7. 8 / 0025 Ü bersc hrift en/ELTR A 1. 1 Ü bersc hrift en/ 11 Leak c hec ki ng ELTR A @ 6\ mod_1369642077339_9.doc x @ 42311 @ 2 @ 1
5.4 Leak checking
Pos : 7. 9 / 0010 ELTR A/ 0015 s er vice_i nstr uctions /CS- 2000_s er vic e/15 Ser vice_CS- 2000/ 1525 Modul Leak c hec ki ng @ 9\ mod_1425543451001_9. doc x @ 74754 @ 33 @ 1
Fig. 89: Leak checking
–
Set the power switch (1) to pos. 3.
–
Close the furnace.
–
Press and hold the button (2).
The entire system is checked for leaks.
Содержание CS-2000
Страница 2: ...2 Copyright Copyright by Eltra GmbH Retsch Allee 1 5 D 42781 Haan Germany ...
Страница 6: ...Notes on service instructions 6 ...
Страница 72: ...Adjustments 72 Fig 57 Gas flow regulation The flow controller mainly consists of the following components ...
Страница 77: ...Adjustments 77 Fig 61 IRC 1 3 ...
Страница 107: ...Service 107 Fig 91 Tubes to squeeze ...
Страница 120: ...Miscellaneous 120 6 1 2 Left hand side Fig 106 Left hand side view ...
Страница 122: ...Miscellaneous 122 6 1 3 Right hand side Fig 107 Right hand side view ...
Страница 129: ...Miscellaneous 129 6 1 7 Infrared cell Fig 111 Infrared cell ...
Страница 139: ...Miscellaneous 139 Fig 119 Left hand side power wiring 6 2 3 Valve wiring ...
Страница 140: ...Miscellaneous 140 Fig 120 Valve wiring 6 2 4 Control signal wiring Fig 121 Control signal wiring ...
Страница 142: ...Miscellaneous 142 6 2 6 IR cell internal signals Fig 123 IR current supply new version ...
Страница 145: ...Miscellaneous 145 6 3 2 Gas flow for induction furnace when furnace is open ...
Страница 146: ...Miscellaneous 146 6 3 3 Gas flow for resistance furnace ...
Страница 147: ...Miscellaneous 147 6 3 4 Valve contolling ...
Страница 160: ...Copyright Copyright by Eltra GmbH Retsch Allee 1 5 D 42781 Haan Germany ...