Electrical Operation and Maintenance Manual for Control Cabinet of EC2-S Industrial Robot
5
9. The system must be equipped with monitor instruments to automatically detect
abnormalities in water and gas supply in time for application items (water, compressed
air, protective gas, etc.).
10. If large amounts of scraps, metal dust particles, and tiny particles are generated
during work, please blanket robot body, control cabinet and peripheral devices with
proper covers.
1.3.3 Safety of Starting Robot
Danger
To start robot, first connect the power cord, then turn the power switch from OFF
to ON.
Strictly follow the precautions below and refer to national/international standards
to operate the procedures. The design of safety functions should comply with Robot
Safety Requirements (GB11291.1-2011/ISO10218-1:2006).
Before starting robot, please confirm the emergency stop switch works properly.
1.Please read and understand all manuals, specifications, and other relevant
documents provided by EFORT before operation. In addition, completely understand
procedures of operation, teaching, and maintenance. Meanwhile, make sure all safety
measures are effective in place.
2. Check the names and functions of all switches, displays and signals needed for robot
operation.
3. Do not enter the safety fence unless the power supply is disconnected. Meanwhile,
confirm the protective devices function properly before starting the robot.
4. If several operators work together in the robot operation system, make sure all of
them and relevant personnel are aware that robot should be activated before start.
5. Before switching on the motor, starting teaching, or automatic operation, please
reconfirm no humans or left obstacles are within the safety fence or around the robot.
6. When starting the robot and resuming operation from a faulty state, please put your
hand on the emergency stop switch after turning on the power of the control cabinet to
immediately cut off the power of the motor in case of abnormalities.
7. Before activating robot, please reconfirm the following conditions are met.
• The installation is correct and stable.
• All the connections in the control cabinet are correct. The power supply specifications
(power supply voltage, frequency, etc.) meet the requirements.
• All the application connections (water, compressed air, protective gas, etc.) are correct
and consistent with the specifications and models.
• The connections to peripheral devices are correct.
Содержание EC2-S
Страница 2: ......
Страница 4: ......
Страница 10: ......
Страница 34: ...EFORT INTELLIGENT EQUIPMENT CO LTD 24 15 19 21 front left side panel bottom plate 16 17 20 18...
Страница 84: ...EFORT INTELLIGENT EQUIPMENT CO LTD 74...
Страница 85: ...Electrical Operation and Maintenance Manual for Control Cabinet of EC2 S Industrial Robot 75...
Страница 86: ...EFORT INTELLIGENT EQUIPMENT CO LTD 76...
Страница 87: ...Electrical Operation and Maintenance Manual for Control Cabinet of EC2 S Industrial Robot 77...
Страница 88: ...EFORT INTELLIGENT EQUIPMENT CO LTD 78...
Страница 89: ...Electrical Operation and Maintenance Manual for Control Cabinet of EC2 S Industrial Robot 79...
Страница 90: ...EFORT INTELLIGENT EQUIPMENT CO LTD 80...
Страница 91: ...Electrical Operation and Maintenance Manual for Control Cabinet of EC2 S Industrial Robot 81...
Страница 92: ...EFORT INTELLIGENT EQUIPMENT CO LTD 82...
Страница 120: ......