EMR-5000
IM02602012E
Commissioning Example: Supervision Scheme 50BF
Object to Be Tested:
Test of the Breaker Failure protection (Supervision Scheme 50BF).
Necessary Means:
Current source;
Ammeter; and
Timer.
When testing, the applied test current must always be higher than the tripping
threshold
»I-BF«. If the test current falls below the threshold while the breaker
is in the “Off” position, no pickup will be generated.
Procedure
(Single-Phase):
For testing the tripping time of the BF protection, a test current has to be higher than the threshold value of one of the
current protection modules that are assigned to trigger the BF protection. The BF trip delay can be measured from the
time when one of the triggering inputs becomes active to the time when the BF protection trip is asserted.
To avoid wiring errors, checked to make sure the breaker in the upstream system switches off.
The time, measured by the timer, should be in line with the specified tolerances.
Successful Test Result:
The actual times measured comply with the setpoint times. The breaker in the higher-level section switches off.
Re-connect the control cable to the breaker!
www.eaton.com
824
Содержание EMR-5000
Страница 62: ...EMR 5000 IM02602012E Ethernet RJ45 Terminal Marking www eaton com 62 1 8 TxD TxD RxD N C N C RxD N C N C...
Страница 271: ...EMR 5000 IM02602012E Fault Recorder Module Signals Signal Description Res record Signal Delete Record www eaton com 271...
Страница 524: ...EMR 5000 IM02602012E Motor Protection Curves Motor Protection Curve Example 1 www eaton com 524...
Страница 525: ...EMR 5000 IM02602012E Motor Protection Curve Example 2 without RTDs www eaton com 525...
Страница 526: ...EMR 5000 IM02602012E Motor Protection Curve Example 3 with RTDs www eaton com 526...
Страница 930: ...EMR 5000 IM02602012E Real Time Clock Running Reserve of the Real Time Clock 1 year min www eaton com 930...