SiEBE18-526
Test Operation
Test Operation
107
1.1.3 Judging and reprogramming in case of redundant BP addresses
The BP unit of this system is provided with specific addresses in its production stage. These
addresses are used to conduct various controls. If by any chance (on 3 out of 260000 units)
these addresses are redundant, the system may get in trouble. When replacing the PCB of the
BP unit too, these addresses may be used repeatedly.
Address redundancy checking flowchart
Reprogramming the PCB addresses of BP unit
Modify the DIP switch (DS2) settings on the BP unit's PCB in the following way.
With the system set up, power on both the
outdoor unit and BP unit.
The compressor is in a non-startup
condition.
Example: thermostat control off,
alarm being issued, heating with
high outdoor
air temperature, compressor
failure, etc.
BP addresses redundancy.
Reprogram the addresses.
Normal
Set the outdoor unit PCB in the monitor mode
and check the number of indoor units being
connected.
Is the number of connected indoor units correct?
Give a start command from the indoor unit. Does
the compressor start in 20 minutes? (Test run
cannot be made either.)
No
No
Yes
Yes
(Q0517)
(Q0444)
H1P (LED A)
H2P (LED 1)
H3P (LED 2)
H4P (LED 3)
H5P (LED 4)
OFF ON
DS2-1
DS2-2
DS2-3
DS2-4
D
S
2
Содержание Super Multi Plus D-Series
Страница 1: ...SiEBE18 526 D Series Service Manual Applied Models zSuper Multi Plus Heat Pump...
Страница 12: ...SiEBE18 526 List of Functions 1 Part 1 List of Functions 1 List of Functions 2...
Страница 63: ...Refrigerant Flow for Each Operation Mode SiEBE18 526 52 Refrigerant Circuit...
Страница 167: ...Instruction SiEBE18 526 156 System Configuration FDXS25 35C CDXS50 60C 3 6 8 9 10 7 1 4 5 2 Names of parts Indoor Unit...
Страница 249: ...Instruction SiEBE18 526 238 System Configuration...
Страница 395: ...2 5 DS1 3 DS1 4 BP Unit ON OFF Connect BP unit Not connect BP unit Do not change the factory setting Not Used...