Others
No.
Inspection item
Inspection content
PTI
2
nd
year
4
th
year
8
th
year
1) Calibration
2) Sensor error inspection and
replacement
3) Chart drive inspection
14
Temperature recorder
4) Recording operation inspection
inspection
5) Loose terminal
6) Chart drive dry battery inspection,
and replacement
7) Check and replacement of pen
lifting battery
1) Check and replacement of
15
Electronic controller
wake-up battery
2) LCD panel replacement
1) Speed switchover
16
Evaporator fan motor
2) Revolution direction
3) Motor replacement
17
Condenser fan motor
1) Rotating direction
2) Motor replacement
18
Evaporator fan
1) Deformation and damage
inspection
19
Condenser fan
1) Deformation and damage
inspection
Check for abnormal noise
1
and vibration during operation
2
Temperature control
1) 0˚C operation
function
2) –18˚C operation
3
Defrosting function
4
Unit water-cleaning
5
Ventilation opening
1) Calibration
detector function
3-48
Electrical
system
※
The service life of the wake-up battery is approx. one year (alkali battery). For USDA transportation,
replace the battery with a new alkali battery when PTI is performed.
https://daikin-p.ru
Содержание LXE10E-1
Страница 161: ...7 9 https daikin p ru ...
Страница 162: ...7 14 Schematic wiring diagram LXE10E 1 7 10 https daikin p ru ...
Страница 163: ...7 15 Stereoscopic wiring diagram LXE10E 1 7 11 https daikin p ru ...