![Daikin LXE10E-1 Скачать руководство пользователя страница 91](http://html.mh-extra.com/html/daikin/lxe10e-1/lxe10e-1_service-manual_502339091.webp)
3-49
3.9.2 Automatic PTI (Pre-Trip Inspection)
●
The automatic PTI function is provided so as to ensure correct inspection and to shorten inspection
time.
(1) Appearance inspection of unit
q
Physical damage
w
Casing insulation through hole area
e
Drain hose (dust and clogging)
r
Power cable and plug damage
t
Condition of refrigerant piping fasteners.
y
Condition of each sensor installation
u
Loose mounting sections
Bolts and nuts ----- Casing frame, compressor, fan motor control box and temperature recorder box
Cable glands ----- Control box
i
Conditions of control box cover packing (water-proof) and temperature recorder box cover packing
(water-proof)
o
Magnetic contactor contact point for burning out.
(2) Inspection before unit operation
q
Gas leakage inspection
w
Power voltage inspection
(Automatic PTI range)
(3) Starting inspection and operation inspection of safety device and control equipment
q
Starting
Inspection whether the starting procedure is proper or not
Inspection for abnormal noise and abnormal vibration
Moisture in the refrigerant ----- This is reinspected at the end of PTI.
Rotating direction of fan motor.
w
Safety device
HPS ----- Measurement of the actuating pressure by stopping the condenser
fan motor.
e
Control equipment
Solenoid valve
----- Inspection of operation (open and close) and leakage
EFM
----- Speed switchover and rotating direction
EV, SMV
----- Inspection of operation (open and close) and leakage
(4) Operation in each mode
q
Pull-down
/
0˚C
Pull-down time, voltage and current
w
Chilled control
0˚C
Electronic temperature Return, supply air temperature differential, voltage and current
recorder calibration
e
Defrosting
Defrosting time
r
Pull-down
/
–18˚C
Pull-down time, evaporator fan motor speed switchover
t
Frozen control
–18˚C Electronic temperature (Temperature differential and rotating direction)
recorder calibration ON/OFF, voltage and current
Remained frost inspection
(5) PTI report preparation
https://daikin-p.ru
Содержание LXE10E-1
Страница 161: ...7 9 https daikin p ru ...
Страница 162: ...7 14 Schematic wiring diagram LXE10E 1 7 10 https daikin p ru ...
Страница 163: ...7 15 Stereoscopic wiring diagram LXE10E 1 7 11 https daikin p ru ...