SiBE811001EB
Test Operation
CONVENI-PACK
66
Note:
After knocking out the holes, we recommend you remove burrs in the knock holes and paint
the edges and areas around the edges using the repair paint.
5.5.3 Checking of Device and Installation Conditions
Be sure to check the followings.
<For those doing electrical work>
See “
Procedure for Incoming Wiring
”.
1.
Make sure there is no defective power wiring or loosing of a nut.
See “
Procedure for Power Supply Wiring
”.
2.
Has the insulation of the main power circuit deteriorated?
Measure the insulation and check the insulation is above regular value in accordance with
relevant local and national regulations.
<For those doing pipe work>
1.
Make sure piping size is correct.
See “
Selection of Piping Material
”.
2.
Make sure insulation work is done.
See “
Thermal Insulation Work
”.
3.
Make sure there is no defective refrigerant piping.
See “
REFRIGERANT PIPING
”.
Insulation material
Coking, etc.
Gas side
stop valve
Indoor/Outdoor
interunit piping
Liquid side
stop valve
Liquid side piping
Block
Gas side piping
Piping lead-out
hole lid
Open a knock
hole at