Troubleshooting
SiBE811001EB
329
CONVENI-PACK
[About the constraints at the time of 2 or more booster units connection]
O The pattern which can 2 or more set connect a booster units is shown below.
<Pattern 1>
A freezer showcase
Outdoor unit
C
C
<Pattern 2>
Booster unit
Discharge pipe length
C
Branch pipe (booster discharge)-Main pipe (outdoor suction pipe)
Less than 30 m
C1
C2
C3
Diameter of discharge pipe
Discharge piping length
C1,C2
Branch pipe (booster discharge) -a connection point
φ
9.5xt0.8
Max
(
C1,C2)+C3
Less than 30 m
C3
Connection point -main piping (outdoor suction pipe)
φ
12.7xt0.9
<CAUTION> It’s not allowed to connect 2 booster units and 1 freezer showcase.
Booster unit
A freezer showcase
Outdoor unit
Booster unit
Booster unit
A freezer showcase
A freezer showcase
Outdoor unit
Booster unit
Booster unit
T-joint
Main pipe
∗
2
Discharge pipe (C3)
∗
1
Discharge pipe
To Outdoor unit
Discharge pipe (C1)
Discharge pipe (C2)
Discharge pipe (C3)
∗
3
Suction pipe temp.
less than 30K
SH10K or more
Suction pipe temp.
less than 30K
SH10K or more
Suction pipe temp.
less than 20 ˚C
(in case full load
operation)
SH10K (all) or more
-Please connect the connection with main
piping for tops.
Refer to part
∗
1
(Because of why, to avoid oil collection in
booster unit which is in stop.)
T-joint
Main pipe
Suction pipe temp.
less than 30K
SH10K or more
Suction pipe temp.
less than 20 ˚C
(in case full load
operation)
SH10K (all) or more
-Please connect the connection with main
piping for tops.
Refer to part
∗
2
-Please connect the connection front part
of a booster unit discharge pipe for tops.
Refer to part
∗
3.
<The reason of prohibition>
There is possibility of compressor damage
due to refrigerant oil drift.