INSTALLATION APPOINTMENT ORDER
Assemble or Install
Description of Action
3.
Bring tools and product to site location, ensuring finished
walls and hardwood floors are protected from dings by
laminate. Use empty packaging, blanket or cloth underneath
laminate on hardwood floors.
Customer Review
and
Payment Collection
8.
Double-check your installation against the design plans.
Ensure all shelves, drawers and other accessories are in correct
place. Demonstrate to client, if available, how to adjust shelf
height, etc. Collect payment, if applicable, from client.
Unload Product and
Tools
4.
If removal of existing, built-in shoe racks, cabinetry or
cleats and baseboard is necessary, tearout must be completed
before installation of new system. (For safety, ensure nails or
other fasteners are removed or bent down on the loose
materials removed from the closet.)
Tearout
5.
Install all closet systems.
Install Closet Product
6.
Wipe down all shelves, poles and partitions with soft cloth.
Clean with household cleaner.
Clean Closet
System(s)
7.
Vacuum the floor where parts were assembled and stored
while in assembly process.
Vacuum
Installation Order - 3
INTRODUCTION
Remove Waste and
Tools
Inspect Site
Arrival
1.
Arrive on site. Greet customer, if available. Review
installation process with client, if available.
2.
Inspect installation site with design plans in hand and tape
measure. Verify all clothing has been removed and closet
is prepared for installation. Double check closet measurements
against plans. If there are no major obstacles to installation
(i.e. drastically incorrect measurements requiring new
closet components), determine best route to transport tools
and closet parts to site.
9.
Remove waste from top shelves and other parts. Take tools to
truck.
7