PREP
ARA
TION
Installation of a MultiSuite
System and its related components requires skill and familiarity
with installation of the floor-mounted and hanging systems for closets.
Proper anchoring of the rail to wall supports, and the brackets to the panels, is essential to
successful installation and to ensure your system will bear the heavy weight of the
components and the items stored therein. Tall and Base 24” deep cabinets
MUST
be
supported by feet in addition to the rail support system. Feet
MUST
be installed under
BOTH a vertical panel AND a fixed shelf to prevent possible camlock blowouts from
shelves. And all Tall cabinets require a minimum of three (3) fixed cam shelves (top,
bottom, middle) for adequate support.
PAR
TS
DESCRIPTION
Rail and Cover
#10 x 2” Washer Hex Head Screws
Left and Right Brackets
Vertical Panels
Cam Fixed Shelves
Adjustable Shelves
Slip In Studs
Screw In Studs
Double Sided Studs
Zip Toggle Bolts
#8 x 5/8” Screws
Easy Anchors
Angle Brackets
#8 x 1-1/4” Screws
Assorted Garage Components…
SPECIAL TOOLS: Right Angle (90-Degree) Drill
See related assembly and installation instructions for other components of this system, such as
drawers and doors.
For best results, review all assembly instructions in advance of installation to ensure you have
all parts and tools and to pre-plan for more difficult aspects of the installation.
BRACKET & PANEL ASSEMBLY
•
Prior to fastening the brackets to your
hanging panels ensure they do not
require trimming to fit above a garage
mudsill. Shorten, or notch, any panels that
may be affected to fit above or around the
mudsill. (See Fig. 1.)
•
Mount all left and right suspension brackets
to the hanging panels prior to installation
using two (2) #8 x 5/8” screws through the
bracket into the pre-drilled bracket holes.
(See Fig. 2.)
Fig. 1
Hanging Cabinets
MULTI-SUITE SYSTEM ASSEMBLY
ASSSEMBL
Y ORDER
¢
Hanging Cabinet
£
Drawer Assembly
£
Door Installation
£
Counters & Slat
Wall
68