a
b
Tower System - Pg. 3
SHELVING/TOWER ASSEMBLY
7.
Line up two of the cam locks of the top fixed
shelf over the screw-in/double-sided studs and
press over the cams to fasten. Tighten the joint
by turning each of the cam locks a full 180˚
clockwise with a Phillips head screwdriver.
(See Fig. 7.)
8.
Next, fasten the bottom fixed shelf by angling
the shelf upwards and pushing the back cams
over the studs in the back. (See Fig. 7b.) Use a
screwdriver to turn each cam lock a full 180˚
clockwise. (See Fig. 7a and 7b.) Lower front
of shelf and use a short-handled screwdriver to
secure front cam locks. (See Fig. 8.)
NOTE: Omit bottom shelf if appropriate to the design or for
double-hang section.
5.
Position the next panel (a thru-drilled panel for
a continuous system), aligning the holes in the
panel with the dowels in the cleat. Thread one
(1) HiLow screw from hole in outside of thru-
drilled panel into center hole of cleat. (See Fig.
5a.) Push double-sided studs through holes in
panel to align with previously-installed
screw-in studs. (See Fig. 5b.)
6. Fasten the cleat to the closet’s wall with two
appropriate wall screws. (See “Working with
Different Wall Types” section and Fig. 6.)
b
a
HINT: In the case of walls which are not square, do not
fully tighten cleat screws until all system parts are in place!
Fig. 8
Fig. 5
Fig. 6
23
Fig. 7