43”
1.
Lay down both tower side panels
(partitions) face up on the cardboard or
cloth with the notched ends at the bot-
tom facing in. (See Fig. 1.) Use a screw-
driver to thread six (6) screw-in studs into
one side panel (the one that will be on
the side wall) as shown. Two (2) screw-
in studs will go into top holes, two (2)
screw-in studs will go into holes located
INST
ALLA
TION
Fig. 3
NOTE: For towers with drawers or baskets, it is
optional to fasten the slide runners on each of the side
panels either before full assembly, lying on the floor, or
after standing up the tower. (See "Drawer" in "DRAWER
AND DOOR ASSEMBLY” section for detailed instructions
on runner location and installation.)
Fig. 1
Tower System - Pg. 2
SHELVING/TOWER ASSEMBLY
43" down from top, and two (2) screw-in studs
will be above the baseboard notch (5th from the
bottom of the panel). (Do not install studs into
the other panel at this time!)
2.
Align dowels in one end of cleat with holes in
top of left panel as shown. Push cleat dowels
into holes. See Fig. 2.
3. Turn panel over and thread one (1) HiLow
screw from hole in outside of left panel into
center hole of cleat. See Fig. 3.
4. Stand panel/cleat upright and place into
position in closet as shown in Fig. 4. Secure
panel to one sidewall using appropriate wall
hardware (see "Working with Different Wall
Types"). Secure wall hardware at top and
bottom of panel (at about the 7th or 8th hole
locations) preferably at a stud location.
Fig. 4
22
Fig. 2