Fig. 3
1.
Determine final rail and cover length.
Total the measurements of the width of
all combined shelves, stop-drilled and
through-drilled panels on this wall.
INST
ALLA
TION
(See Fig. 4.)
2.
Next, draw a level line at 79-5/8” from
highest point of the floor. (If floor slopes
– mostly likely from rear of a garage to
garage vehicle door – begin your level
line measurement at 79-1/8” from floor
and extend level necessary length.)
•
Install all leg flanges under all tall and base
24” cabinet panels using the screws provided.
(See Fig. 3.) Flanges should be positioned
on 3” centers measured back from the front
edge of panels and should be flush to either
the left or right outside of a panel section.
(Feet flanges require four total screws. Fasten
two of the screws into the bottom edge of
outside panels and you will fasten the
remaining two screws through the flange into
the bottom fixed shelf later in assembly.) Feet
flanges
MUST
be installed under both the
vertical panel and the shelf as shown.
Fig. 2
•
For contiguous panels sharing bottom shelves
on either side, install the flange centered on
a diagonal so that two screws will fasten into
the panel, and one screw each will fasten into
the bottom shelf on either side. (See Fig. 9.)
NOTE: You must install an additional center foot under 48”
shelving sections, positioned 3” from front edge on center,
for adequate support of extra wide cabinet or shelving
section.
•
Mount all drawer runners, if desired, prior to
hanging the panels on the rail.
Fig. 4
3.
For base cabinets on a level floor, draw line at
33-5/8” from the floor. If your design includes
a mix of tall and base cabinets, draw your
base cabinet line 46” down from the top (tall
Hanging Cabinets- 2