a
b
c
d
d
NOTE: It may be difficult to screw in cleats while the tower
panels are lying on the floor. You may wish to complete
fastening of cleats once you stand up the tower.
4.
To use the cleat as a toekick, remove the four
dowels from the cleat. Fasten the cleat in the
toekick position using one HiLow screw
through each side panel. (See Fig. 4.) (See
“Toe Kick Installation” instructions for further
details on contiguous panel toekick installation.)
5.
Attach the remaining side panel to the
cammed shelves and cleats or toe kicks
following steps 3-5, as necessary. See Fig. 5.
If preferred, gently rollover the tower onto
either side panel in order to complete
fastening of various screws and studs into
each panel.
Fig. 4
Fig. 5
Stand Alone Tower - Pg. 3
SHELVING/TOWER ASSEMBLY
20
6.
Stand up the tower. Add fast caps to any
exposed screw heads. Place the tower in its
final location in the closet. Watch for over-
head obstacles while maneuvering tower into
place.
7. Level tower system, adding shims, if
necessary, to one or more partitions.
8. Attach fast caps to any exposed screw heads.
9. Fasten the tower to the closet’s wall with
appropriate wall screws through the upper
cleat. (See “Working with Different Wall
Types” for details.) (See Fig. 6.)
10.
After securing all parts and tightening cleat
screws, install the remaining accessories
(doors, drawers, shoe fences, sliding racks,
etc.).
Fig. 6