Chapter 2
2-6
F-2-14
9) Take care of the following items to unpack the entire drum cartridge
package.
Make sure to remove the drying agent [1] and the antifriction sheet [2] first.
F-2-15
- Do not remove the sealing tape [1] and the drum protection cover [2].
- Do not press the drum area [3] over the drum protection cover [2]. It may
cause the damage of the drum area.
- Do not touch the waste toner shutter [4]. It may loosen the stopper [4].
F-2-16
- Make sure to execute in the order of Y/M/C/Bk for step 10) through 12).
- Check the color of the drum cartridge by the label [1].
F-2-17
10) Hold the drum cartridge with both hands as shown in the figure, and
shake it up and down 5 times to ensure the developer inside spread
evenly.
F-2-18
11) Hold down the drum cartridge as shown in the figure, and draw the
sealing tape [1] in the direction shown by the arrow.
F-2-19
12) Hold the drum cartridge as shown in the figure below to set to the
specified position of the ITB unit.
- Do not press the drum area over the drum protection cover. It may cause
the damage of the drum area.
- Check to see if the waste toner shutter label [1] is visible when setting. If
the drum cartridge is set with the waste toner shutter [2] loosen, the waste
toner shutter label [1] cannot be seen and the parts may be broken at
rotating the handle in the step 17).
- Check to see if the drum cartridge is inserted to the specified position.
[1]
[2]
[1]
[2]
[3]
[2]
[1]
[4]
[1]
[1]
Содержание iR C2880 series
Страница 1: ...Aug 29 2006 Service Manual iR C3380 2880 Series ...
Страница 2: ......
Страница 6: ......
Страница 23: ...Chapter 1 Introduction ...
Страница 24: ......
Страница 26: ......
Страница 52: ......
Страница 53: ...Chapter 2 Installation ...
Страница 54: ......
Страница 127: ...Chapter 3 Basic Operation ...
Страница 128: ......
Страница 130: ......
Страница 136: ......
Страница 137: ...Chapter 4 Main Controller ...
Страница 138: ......
Страница 160: ......
Страница 161: ...Chapter 5 Original Exposure System ...
Страница 162: ......
Страница 188: ...Chapter 5 5 24 F 5 68 4 Remove the original sensor 2 hook 1 F 5 69 ...
Страница 189: ...Chapter 6 Laser Exposure ...
Страница 190: ......
Страница 192: ......
Страница 206: ......
Страница 207: ...Chapter 7 Image Formation ...
Страница 208: ......
Страница 256: ......
Страница 257: ...Chapter 8 Pickup Feeding System ...
Страница 258: ......
Страница 262: ......
Страница 303: ...Chapter 9 Fixing System ...
Страница 304: ......
Страница 306: ......
Страница 321: ...Chapter 10 Externals and Controls ...
Страница 322: ......
Страница 326: ......
Страница 336: ...Chapter 10 10 10 F 10 10 2 Remove the check mark from SNMP Status Enabled ...
Страница 337: ...Chapter 10 10 11 F 10 11 ...
Страница 359: ...Chapter 11 MEAP ...
Страница 360: ......
Страница 362: ......
Страница 401: ...Chapter 12 RDS ...
Страница 402: ......
Страница 404: ......
Страница 411: ...Chapter 13 Maintenance and Inspection ...
Страница 412: ......
Страница 414: ......
Страница 416: ...Chapter 13 13 2 F 13 1 8 9 1 2 3 3 5 6 7 10 11 12 13 14 4 ...
Страница 421: ...Chapter 14 Standards and Adjustments ...
Страница 422: ......
Страница 424: ......
Страница 431: ...Chapter 15 Correcting Faulty Images ...
Страница 432: ......
Страница 434: ......
Страница 459: ...Chapter 16 Self Diagnosis ...
Страница 460: ......
Страница 462: ......
Страница 481: ...Chapter 17 Service Mode ...
Страница 482: ......
Страница 484: ......
Страница 571: ...Chapter 18 Upgrading ...
Страница 572: ......
Страница 574: ......
Страница 603: ...Chapter 19 Service Tools ...
Страница 604: ......
Страница 605: ...Contents Contents 19 1 Service Tools 19 1 19 1 1 Special Tools 19 1 19 1 2 Solvents and Oils 19 2 ...
Страница 606: ......
Страница 609: ...Aug 29 2006 ...
Страница 610: ......