
Technician Procedures
SuperTrak™ GEN3 System Operation and Maintenance Manual
233
Rev. 9 (12-2021)
9. Clean the top of the section with a soft cloth to remove any debris.
Install an Upper V-Rail - 180 Deg. (800 mm) Section
1. Hold the new upper v-rail horizontally, with the counter-bore side up.
2. Slide the new upper v-rail between the upper v-rails of the adjacent sections.
3. Equally divide the gap between the ends of the upper v-rail.
The gap should be close to 0.5 mm (0.02 in.) on both sides.
4. Install the 0.25 mm (0.01 in.) shims. Restore them to the position you made
note of during the removal procedure.
5. Install the twenty one (21) screws into the top of the upper v-rail, while
keeping the back of the upper v-rail biased to the structure.
6. Reinstall the left and right encoder assemblies.
Install an Encoder Assembly - Straight and Curved Sections
Replace an Upper V-Rail - 90 Deg. Section
Remove an Upper V-Rail - 90 Deg. Section
1. Turn the
SuperTrak conveyance platform power disconnect switch
to
the OFF position.
2. Lock out and tag hazardous energy.
3. Remove section’s encoder assemblies as
well as the encoder assemblies on the
adjacent sections.
Содержание SuperTrak GEN3
Страница 1: ...Rev 9 December 2021...
Страница 2: ......
Страница 3: ...SuperTrak GEN3 Conveyance Platform Modular Conveyor Operation and Maintenance Manual...
Страница 6: ......
Страница 12: ...This page is intentionally blank...
Страница 30: ...This page is intentionally blank...
Страница 58: ...This page is intentionally blank...
Страница 296: ...This page is intentionally blank...
Страница 300: ...This page is intentionally blank...
Страница 364: ...This page is intentionally blank...
Страница 366: ...This page is intentionally blank...