
SuperTrak Conveyance Platform Overview
SuperTrak™ GEN3 System Operation and Maintenance Manual
41
Rev. 9 (12-2021)
D
PLC connection (EtherNet/IP,
EtherCAT, or PROFINET)
N
UPS disconnect
a
E
Bus controller (POWERLINK)
O
SuperTrak conveyance platform power
disconnect switch (3 phase)
b
F
Power supply module
P
Single point ground connection
G
Breaker - enclosure fan
Q
Terminals
H
13A breaker - All SuperTrak
conveyance platform digital power
R
Power supply breakers (space for 6 or
12 breakers)
I
6A breaker - controller
S
Safety contactor #1
J
2A breaker - I/O bus coupler
T
Safety contactor #2
a.Disconnects the 24V digital battery power
b.Disconnects the AC power to the SuperTrak conveyance platform.
Содержание SuperTrak GEN3
Страница 1: ...Rev 9 December 2021...
Страница 2: ......
Страница 3: ...SuperTrak GEN3 Conveyance Platform Modular Conveyor Operation and Maintenance Manual...
Страница 6: ......
Страница 12: ...This page is intentionally blank...
Страница 30: ...This page is intentionally blank...
Страница 58: ...This page is intentionally blank...
Страница 296: ...This page is intentionally blank...
Страница 300: ...This page is intentionally blank...
Страница 364: ...This page is intentionally blank...
Страница 366: ...This page is intentionally blank...