Technician Procedures
SuperTrak™ GEN3 System Operation and Maintenance Manual
235
Rev. 9 (12-2021)
Install an Upper V-Rail - 90 Deg. Section
1. Hold the new upper v-rail horizontally, with the counter-bore side up.
2. Slide the new upper v-rail between the upper v-rails of the adjacent sections.
3. Equally divide the gap between the ends of the upper v-rail.
The gap should be close to 0.5 mm (0.02 in.) on both sides.
4. Install the 0.25 mm (0.01 in.) shims. Restore them to the position you made
note of during the removal procedure.
5. Re-install the fifteen (15) screws into the top of the upper v-rail, while keeping
the back of the upper v-rail biased to the structure.
6. Reinstall the encoder assemblies on the 90 deg. section and adjacent sections.
Install an Encoder Assembly - Straight and Curved Sections
Replace an Upper V-Rail - 180 Deg. (500 mm) Section
Remove an Upper V-Rail - 180 Deg. (500) Section
1. Turn the
SuperTrak conveyance platform power disconnect switch
to
the OFF position.
2. Lock out and tag hazardous energy.
3. Remove the upper v-rail from the two (2) adjacent straight sections.
Remove an Upper V-Rail - 180 Deg. (500) Section
4. Remove the left and right encoder assemblies from the 180 deg. section.
Remove an Encoder Assembly - Curved Sections
5. Remove ten (10) screws and ten (10)
washers from the top cover of the 180
deg. section, and then lift and remove the
top cover.
Содержание SuperTrak GEN3
Страница 1: ...Rev 9 December 2021...
Страница 2: ......
Страница 3: ...SuperTrak GEN3 Conveyance Platform Modular Conveyor Operation and Maintenance Manual...
Страница 6: ......
Страница 12: ...This page is intentionally blank...
Страница 30: ...This page is intentionally blank...
Страница 58: ...This page is intentionally blank...
Страница 296: ...This page is intentionally blank...
Страница 300: ...This page is intentionally blank...
Страница 364: ...This page is intentionally blank...
Страница 366: ...This page is intentionally blank...