
Technician Procedures
SuperTrak™ GEN3 System Operation and Maintenance Manual
167
Rev. 9 (12-2021)
Install an Encoder Assembly - Straight and Curved Sections
Power to the controller and gateways should OFF while installing encoders, and
then turned ON before calibration.
1. If required, remove the old encoder assembly.
Remove an Encoder Assembly - Straight Section
Remove an Encoder Assembly - Curved Sections
2. Connect the RJ11 plug to the new encoder assembly connection.
3. Align the encoder assembly with the locating dowels.
4. To prevent damage to the RJ11 connection, make sure it is aligned with the
RJ11 opening.
5. Press the encoder assembly firmly down onto the locating dowels.
6. Secure the encoder assembly in position with five (5) screws.
7. Install an encoder assembly screw cap over each of the five (5) screws.
8. Remove locks and tags.
9. Turn the
SuperTrak conveyance platform power disconnect switch
to
the ON position.
10. Calibrate the motor with the new encoder assembly.
See the TrakMaster built-in help for the calibration procedure.
11. If the straight section has a pallet setup stationary mount installed, reference
the encoder positions.
Содержание SuperTrak GEN3
Страница 1: ...Rev 9 December 2021...
Страница 2: ......
Страница 3: ...SuperTrak GEN3 Conveyance Platform Modular Conveyor Operation and Maintenance Manual...
Страница 6: ......
Страница 12: ...This page is intentionally blank...
Страница 30: ...This page is intentionally blank...
Страница 58: ...This page is intentionally blank...
Страница 296: ...This page is intentionally blank...
Страница 300: ...This page is intentionally blank...
Страница 364: ...This page is intentionally blank...
Страница 366: ...This page is intentionally blank...