Technician Procedures
SuperTrak™ GEN3 System Operation and Maintenance Manual
175
Rev. 9 (12-2021)
5. Pull the 15A fuse straight out from the slot.
6. Install a new 15A fuse straight into the fuse slot.
Make sure the fuse is centered and seated correctly during installation.
7. If required, connect any coil connections that were disconnected in step 4.
Replace a Coil Fuse - 180 Deg. Section (500 mm)
1. Turn the
SuperTrak conveyance platform power disconnect switch
to
the OFF position.
2. Lock out and tag hazardous energy.
3. Remove the top cover from the 180 deg. section.
4. Pull the 15A fuse straight out from the slot.
5. Install a new 15A fuse straight into the fuse slot.
Make sure the fuse is centered and seated correctly during installation.
Содержание SuperTrak GEN3
Страница 1: ...Rev 9 December 2021...
Страница 2: ......
Страница 3: ...SuperTrak GEN3 Conveyance Platform Modular Conveyor Operation and Maintenance Manual...
Страница 6: ......
Страница 12: ...This page is intentionally blank...
Страница 30: ...This page is intentionally blank...
Страница 58: ...This page is intentionally blank...
Страница 296: ...This page is intentionally blank...
Страница 300: ...This page is intentionally blank...
Страница 364: ...This page is intentionally blank...
Страница 366: ...This page is intentionally blank...