
Installation
SuperTrak™ GEN3 System Operation and Maintenance Manual
59
Rev. 9 (12-2021)
16. Install the first curved section.
17. For 180 deg. sections, use shims to verify that a 0.5 mm (0.02 in.) gap exists
between the 180 deg. section and each of the two (2) abutting straight sections
(between the track structure [or aluminum extrusion], not between the linear
motors [or motor laminations]).
For 90 degree sections, use shims to verify that a 0.5 mm (0.02 in.) gap exists
between the 90 deg. section and each of the two (2) abutting sections.
Содержание SuperTrak GEN3
Страница 1: ...Rev 9 December 2021...
Страница 2: ......
Страница 3: ...SuperTrak GEN3 Conveyance Platform Modular Conveyor Operation and Maintenance Manual...
Страница 6: ......
Страница 12: ...This page is intentionally blank...
Страница 30: ...This page is intentionally blank...
Страница 58: ...This page is intentionally blank...
Страница 296: ...This page is intentionally blank...
Страница 300: ...This page is intentionally blank...
Страница 364: ...This page is intentionally blank...
Страница 366: ...This page is intentionally blank...