![ABB REC650 ANSI Скачать руководство пользователя страница 223](http://html.mh-extra.com/html/abb/rec650-ansi/rec650-ansi_technical-manual_2772223.webp)
SealIn = Enabled
All VP < V
SealInPU
Any VP < V
sealInPU
AND
3PH
MCBOP
All VP > V
sealInPU
52a
BLOCK
AND
TEST
TEST ACTIVE
AND
BlocFuse = Yes
OpModeSel
AND
AND
OR
89b
BLKV
BLKZ
AND
AND
FuseFailDetZeroSeq
V0I0 OR V2I2
V0I0 AND V2I2
V0I0
V2I2
OptimZsNs
AND
FuseFailDetNegSeq
OR
AND
AND
CurrZeroSeq
CurrNegSeq
a
b
a>b
OR
AND
AND
AND
FuseFailDetDVDI
AND
OpDVDI = Enabled
DeadLineDet1Ph
OR
OR
OR
OR
AND
VoltZeroSeq
VoltNegSeq
OR
AllCurrLow
intBlock
Fuse failure detection
Main logic
OR
ANSI10000041-2-en.vsd
150 ms
0
200 ms
0
0
5 sec
0
60 sec
0
5 sec
ANSI10000041 V2 EN
1MRK 511 287-UUS A
Section 9
Secondary system supervision
217
Technical manual
Содержание REC650 ANSI
Страница 1: ...Relion 650 series Bay control REC650 ANSI Technical manual ...
Страница 2: ......
Страница 42: ...36 ...
Страница 60: ...54 ...
Страница 66: ...60 ...
Страница 424: ...418 ...
Страница 566: ...560 ...
Страница 636: ...630 ...
Страница 699: ...693 ...