7.3.8
Technical data
Table 128:
ROV2PTOV (59N) technical data
Function
Range or value
Accuracy
Operate voltage, step 1
(1-200)% of
VBase
± 0.5% of V
n
at V < V
n
± 0.5% of V at V > V
n
Operate voltage, step 2
(1–100)% of
VBase
± 0.5% of V
n
at V < V
n
± 0.5% of V at V > V
n
Reset ratio
> 98%
-
Inverse time
characteristics for low and
-
See table
Definite time setting, step
1
(0.00–6000.00) s
± 0.5% ± 25 ms
Definite time setting, step
2
(0.000–60.000) s
± 0.5% ± 25 ms
Minimum operate time for
step 1 inverse
characteristic
(0.000-60.000) s
± 0.5% ± 25 ms
Operate time, pickup
function
30 ms typically at 0 to 2 x V
set
-
Reset time, pickup
function
40 ms typically at 2 to 0 x V
set
-
Critical impulse time
10 ms typically at 0 to 1.2 xV
set
-
Impulse margin time
15 ms typically
-
7.4
Loss of voltage check LOVPTUV (27)
7.4.1
Identification
Function description
IEC 61850
identification
IEC 60617
identification
ANSI/IEEE C37.2
device number
Loss of voltage check
LOVPTUV
-
27
7.4.2
Functionality
Loss of voltage check LOVPTUV (27) is suitable for use in networks with an automatic
system restoration function. LOVPTUV (27) issues a three-pole trip command to the
circuit breaker, if all three phase voltages fall below the set value for a time longer than the
set time and the circuit breaker remains closed.
Section 7
1MRK 511 287-UUS A
Voltage protection
186
Technical manual
Содержание REC650 ANSI
Страница 1: ...Relion 650 series Bay control REC650 ANSI Technical manual ...
Страница 2: ......
Страница 42: ...36 ...
Страница 60: ...54 ...
Страница 66: ...60 ...
Страница 424: ...418 ...
Страница 566: ...560 ...
Страница 636: ...630 ...
Страница 699: ...693 ...