Note
Action
xx2000001745
Route the cable package through the swing sup-
port.
Make sure that:
•
the air hoses are facing the SMB side in
the hollow tube of axis-1 gearbox.
•
the cable package is out from the hole near
the base rear, as circled in the figure.
CAUTION
Make sure that no cables or hoses are twisted or
strained. Reroute if necessary.
4
xx2000001747
Screw: M8x40 12.9 Gleitmo
603+Geomet 500 (7 pcs)
Refit the swing support.
5
Tightening torque: 36 Nm
xx2000001684
Grease: 3HAC029132-001
Apply grease to the axis-2 cable protector and
slip it over the cable harness.
6
Plastic cable protector, axis 2:
3HAC067816-001
xx2000001567
Continues on next page
Product manual - CRB 1300
585
3HAC083111-001 Revision: B
© Copyright 2022-2023 ABB. All rights reserved.
5 Repair
5.7.2 Replacing the axis-2 gearbox
Continued
Содержание CRB 1300
Страница 1: ...ROBOTICS Product manual CRB 1300 ...
Страница 2: ...Trace back information Workspace 23A version a14 Checked in 2023 03 20 Skribenta version 5 5 019 ...
Страница 50: ...This page is intentionally left blank ...
Страница 662: ...This page is intentionally left blank ...
Страница 690: ...This page is intentionally left blank ...
Страница 704: ...This page is intentionally left blank ...
Страница 720: ...This page is intentionally left blank ...
Страница 725: ......