Note
Action
Screw: M4x10 12.9 Lafre
2C2B/FC6.9 (4 pcs)
Refit the process hub.
4
Tightening torque: 2.6 Nm
xx2000001538
Securing the cable package in the tubular
Note
Action
Screw: M4x12 12.9 Lafre
2C2B/FC6.9 (2 pcs)
Refit the first semicircular bracket to fix the cable
package.
1
Tightening torque: 2.6 Nm
xx2000001748
Screw: M3x8 12.9 Lafre
2C2B/FC6.9 (2 pcs for each plate)
Refit the connector plate.
2
Tightening torque: 1.3 Nm
xx2000001531
xx2000001530
Route and secure the cabling with cable straps.
CAUTION
Correct cable routing is highly important.
If the cables are routed and secured incorrectly
the cables can be damaged.
3
Continues on next page
Product manual - CRB 1300
465
3HAC083111-001 Revision: B
© Copyright 2022-2023 ABB. All rights reserved.
5 Repair
5.5.3 Replacing the tubular and tilt unit
Continued
Содержание CRB 1300
Страница 1: ...ROBOTICS Product manual CRB 1300 ...
Страница 2: ...Trace back information Workspace 23A version a14 Checked in 2023 03 20 Skribenta version 5 5 019 ...
Страница 50: ...This page is intentionally left blank ...
Страница 662: ...This page is intentionally left blank ...
Страница 690: ...This page is intentionally left blank ...
Страница 704: ...This page is intentionally left blank ...
Страница 720: ...This page is intentionally left blank ...
Страница 725: ......