Separating the cable package from the tubular
Note
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
xx2000001748
Remove the first semicircular bracket that fixes
the cable package.
2
xx2000001749
Remove the second semicircular bracket from the
tubular.
3
Removing the process hub
Note
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
xx2200001000
Remove the screws and carefully open the cover.
CAUTION
There is cabling attached to the cover. The cover
cannot be removed completely until the connect-
ors are removed.
2
Continues on next page
568
Product manual - CRB 1300
3HAC083111-001 Revision: B
© Copyright 2022-2023 ABB. All rights reserved.
5 Repair
5.7.2 Replacing the axis-2 gearbox
Continued
Содержание CRB 1300
Страница 1: ...ROBOTICS Product manual CRB 1300 ...
Страница 2: ...Trace back information Workspace 23A version a14 Checked in 2023 03 20 Skribenta version 5 5 019 ...
Страница 50: ...This page is intentionally left blank ...
Страница 662: ...This page is intentionally left blank ...
Страница 690: ...This page is intentionally left blank ...
Страница 704: ...This page is intentionally left blank ...
Страница 720: ...This page is intentionally left blank ...
Страница 725: ......