
Q00180 Rev B
Page 50 of 244
"Note: Copies are uncontrolled documents - For revision verification see the Master Documentation List"
•
Raise and lower the Cart height adjuster (pull release lever located on the right of the
system), to verify smooth operation and positive locking
•
Ensure the LCD display monitor rotates and adjusts properly
•
Place the Scan Engine onto the Scanner Deck and pull the Scan Engine towards you, to
ensure full docking engagement.
•
Immediately report any mechanical discrepancies to ZONARE.
5.6 System
Installation:
5.6.1 Initial
Checks
STEPS:
1.
Check to ensure all peripherals, software level, and serial numbers correspond with sales order.
Make note of any missing items or discrepancies, and immediately report to ZONARE.
2.
Check the two AC power rating labels, located by the system power receptacle and inside the
rear cover by the AC outlet box, to verify power rating matches AC power level present at
installation site.
3.
Measure voltage at AC receptacle, at install site, to verify proper power levels are present.
WARNING
To prevent possible damage to the electronics of the Scan Engine from condensation, the
following warning must be observed:
If the Scan Engine has been subjected to an environment during shipping/transport that differs
greatly in temperature and/or humidity, from the environment where it has been moved for
installation/intended operation, the unit should be allowed to stand for a period of no less than
30 minutes prior to inserting battery or powering on.
5.6.2
Installing the Battery Pack, into the Scan Engine
STEPS:
1.
Remove the battery pack from its shipping materials
2.
Correctly orient the battery pack and slide fully into the battery port on the Scan Engine, until
fully seated (latched).
Summary of Contents for Z.one Ultra SP
Page 1: ......