9-12
IM 05P02D41-01EN
9.3.3 Time-prioritized PV start (STC=TIME)
Description
With Time-prioritized PV starts, operation start is triggered by segment time, which sets
the time from the PV at program start to the target setpoint (TSP) of segment 1.
CAUTION
Time-prioritized PV start (STC=TIME) cannot be selected when the segment setting
method (SEG.T) is Segment ramp-rate (TM.RT.)
The segment-1 ramps are determined by the segment time (TIME.)
The program pattern will start at PV.
Ramp rate = (Target setpoint (TSP) - PV) / Segment-1 time
The start point of control program pattern will be a point a - e.
TSP
SSP
a
b
c
d
e
Segment 1
Segment 2
Segment 3
Program pattern
Program operation start (PRG)
Time
Setpoint
PV at start
Operation-starting point
a
a
b
b
c
c
d
d
e
e
Setting Details
Parameter
symbol
Name
Display
level
Setting range
Menu symbol
SSP
Starting target
setpoint
EASY
0.0 to 100.0% of PV input range
(EU)
(Setting range: P.RL to P.RH)
PROG
STC
Start code
EASY
SSP: Program operation begins
with the starting target setpoint.
RAMP: Ramp-prioritized PV start
TIME: Time-prioritized PV start
LSP: Local-mode start
9.3 Setting the Program Starting Conditions (STC)
Summary of Contents for UP35A
Page 3: ......
Page 15: ...Blank Page...
Page 35: ...Blank Page...
Page 37: ...Blank Page...
Page 47: ...Blank Page...
Page 229: ...Blank Page...
Page 251: ...Blank Page...
Page 317: ...Blank Page...
Page 387: ...Blank Page...
Page 409: ...Blank Page...
Page 411: ...Blank Page...