9.1.2 Setting the Program Pattern using the Ramp-rate and Segment Time
Description
The segment ramp time criterion bases segment operation on the target setpoint (TSP)
and the segment ramp-rate (TM.RT.)
Ramp time in segment ramp-up or ramp-down is expressed as an amount of change
(between target setpoints) per hour or per minute.
The unit of time is selected with parameter TMU. When segment is set for soaking at a
constant target setpoint, ramp time expresses the time duration of the segment.
Segment time during soak operations
When the target setpoint of the current segment is the same as that of the last segment,
soak operations are performed for the current segment.
The time duration of the soak segment is set with the ramp time parameter TM.RM.
TM.RT
PV
Time
Target setpoint of last segment
(Start target setpoint if
program just started)
Segment-n
operation
Final target setpoint
:
TSP
n=1 to 20 (40 when the option
“/AP” is specified.)
Segment time during ramp-up operations
When the target setpoint of the current segment is higher than that of the last segment,
ramp-up operations are performed for the current segment.
During ramp-up, the amount of change (between target setpoints) per hour or per minute
is set with the ramp time parameter TM.RM.
TM.RT
TM.RT
“TM.RT” sets the amount
of change in this area per
hour or per minute.
PV
Time
Target setpoint of last segment
(Start target setpoint if
program just started)
Segment ramp-rate
(The unit of time is
determined by “TMU”.)
Segment-n
operation
Final target setpoint
:
TSP
n=1 to 20 (40 when the option
“/AP” is specified.)
9.1 Setting the Setting Method of Program Pattern
Summary of Contents for UP35A
Page 3: ......
Page 15: ...Blank Page...
Page 35: ...Blank Page...
Page 37: ...Blank Page...
Page 47: ...Blank Page...
Page 229: ...Blank Page...
Page 251: ...Blank Page...
Page 317: ...Blank Page...
Page 387: ...Blank Page...
Page 409: ...Blank Page...
Page 411: ...Blank Page...