9-10
IM 05P02D41-01EN
Example of a soak segment for segment No. 3 of the control program pattern
The program pattern contains points A1 to E1.
D1
E1
B1
C1
TSP
SSP
Segment 1
Segment 2
Segment 3
a
b
c
d
e
A1
Program pattern
Program operation start (PRG)
Time
Setpoint
Program start point is determined by the control PV as follows.
PV at start
Operation-starting point
a
A1
b
B1
c
C1
d
D1
e
E1 (SSP)
Example of no soak segment in control program pattern
The program pattern contains points A1 to E1. For some PV, the program advances
through the segments up to the point at which the ramp is reversed. When PV is set to
point a, the program advances through the segments up to the point A1 at which the
ramp is reversed.
D1
E1
B1
C1
TSP
SSP
Segment 1
Segment 2
Segment 3
a
b
c
d
e
A1
Program pattern
Program operation start (PRG)
Time
Setpoint
9.3 Setting the Program Starting Conditions (STC)
Summary of Contents for UP35A
Page 3: ......
Page 15: ...Blank Page...
Page 35: ...Blank Page...
Page 37: ...Blank Page...
Page 47: ...Blank Page...
Page 229: ...Blank Page...
Page 251: ...Blank Page...
Page 317: ...Blank Page...
Page 387: ...Blank Page...
Page 409: ...Blank Page...
Page 411: ...Blank Page...