![Yamatake SDC35 User Manual Download Page 256](http://html.mh-extra.com/html/yamatake/sdc35/sdc35_user-manual_905228256.webp)
●
RSP input calibration
(1) Select the
[PV Calibration]
tab.
(2) Select the model
[7: C35/36 RSP]
.
(3) Select the gain No. in the ascending order and perform the operation from
step (4).
(4) Click
[Read]
.
(5) Apply the voltage and current values written next to the gain No. to the PV
input terminal.
For details about how to connect measuring instruments in the apply status, refer
to the following Figures:
(6) Keep the apply status for approximately 30s.
(7) Click
[Write]
.
(8) Return to step (3) and repeat the procedure until the final gain No. is
completed.
Handling Precautions
• In the RSP input calibration, it is always necessary to adjust all gains.
• Do not leave the RSP input terminal open during heat-up between
power ON of this unit and starting of calibration. When the input type
is DC voltage, put the unit in the 0 volt input (or terminals are short-
circuited) status.
11-4
Chapter 11. CALIBRATION
Summary of Contents for SDC35
Page 16: ......
Page 17: ......
Page 19: ... display key para key or V key key enter key 2 second press hold of para key V ...
Page 32: ......
Page 46: ......
Page 58: ......
Page 71: ......
Page 84: ......
Page 95: ......
Page 172: ......
Page 174: ...6 2 Chapter 6 LIST OF DISPLAYS AND SETTING DATA ...
Page 211: ......
Page 230: ......
Page 240: ......
Page 248: ......
Page 260: ......
Page 268: ......
Page 270: ......
Page 279: ......