STEP operation LSP, PID group No., ramp, time
The SP change and PID group No. by step of the step operation can be set.
(Continue on next page.)
5-46
Chapter 5. DETAILED DESCRIPTION OF EACH FUNCTION
Item (Bank)
Display
Contents
Initial value
User level
LSP1 (Step 1)
(SP bank)
SP low limit (C07) to SP high limit (C08)
0
Basic,
Standard,
High function
PID group No. (Step 1)
(SP bank)
1 to 8
1
Standard,
High function
Ramp (Step 1)
(SP bank)
0.0U: No ramp.
0.1 to 999.9U
(The time unit of the ramp is selected in the
SP ramp unit.)
0.0
Time (Step 1)
(SP bank)
0.0 to 999.9s
(The time unit of the step operation is set at
“0.1s”.)
0 to 9999s
(The time unit of the step operation is set at
“1s”.)
0 to 9999 min
(The time unit of the step operation is set at
“1min”.)
0.0
LSP (Step 2)
(SP bank)
Same as step 1.
0
Basic,
Standard,
High function
PID group No. (Step 2)
(SP bank)
1
Standard,
High function
Ramp (Step 2)
(SP bank)
0.0
Time (Step 2)
(SP bank)
0.0
LSP (Step 3)
(SP bank)
Same as step 1.
0
Basic,
Standard,
High function
PID group No. (Step 3)
(SP bank)
1
Standard,
High function
Ramp (Step 3)
(SP bank)
0.0
Time (Step 3)
(SP bank)
0.0
LSP (Step 4)
(SP bank)
Same as step 1.
0
Basic,
Standard,
High function
PID group No. (Step 4)
(SP bank)
1
Standard,
High function
Ramp (Step 4)
(SP bank)
0.0
Time (Step 4)
(SP bank)
0.0
Summary of Contents for SDC35
Page 16: ......
Page 17: ......
Page 19: ... display key para key or V key key enter key 2 second press hold of para key V ...
Page 32: ......
Page 46: ......
Page 58: ......
Page 71: ......
Page 84: ......
Page 95: ......
Page 172: ......
Page 174: ...6 2 Chapter 6 LIST OF DISPLAYS AND SETTING DATA ...
Page 211: ......
Page 230: ......
Page 240: ......
Page 248: ......
Page 260: ......
Page 268: ......
Page 270: ......
Page 279: ......