....................................................... 5-30
REMOVING THE PRIMARY SHEAVE .................................................... 5-33
REMOVING THE SECONDARY SHEAVE ............................................. 5-33
DISASSEMBLING THE SECONDARY SHEAVE.................................... 5-34
CHECKING THE CLUTCH HOUSING .................................................... 5-34
CHECKING THE CLUTCH SHOES ........................................................ 5-34
CHECKING THE V-BELT........................................................................ 5-34
CHECKING THE PRIMARY SHEAVE .................................................... 5-35
CHECKING THE PRIMARY SHEAVE WEIGHTS................................... 5-35
CHECKING THE PRIMARY SHEAVE SLIDERS .................................... 5-35
CHECKING THE SECONDARY SHEAVE .............................................. 5-35
ASSEMBLING THE PRIMARY SHEAVE ................................................ 5-35
ASSEMBLING THE SECONDARY SHEAVE.......................................... 5-36
INSTALLING THE V-BELT...................................................................... 5-37
...................................................... 5-39
REMOVING THE GENERATOR ............................................................. 5-41
REMOVING THE STARTER CLUTCH ................................................... 5-41
CHECKING THE STARTER CLUTCH .................................................... 5-41
INSTALLING THE STARTER CLUTCH .................................................. 5-42
INSTALLING THE GENERATOR............................................................ 5-42
................................................................................... 5-44
CHECKING THE STARTER MOTOR ..................................................... 5-46
...................................................................................................... 5-48
CHECKING THE OIL PUMP ................................................................... 5-49
ASSEMBLING THE OIL PUMP............................................................... 5-49
INSTALLING THE OIL PUMP ................................................................. 5-50
............................................................................................ 5-51
REMOVING THE TRANSMISSION ........................................................ 5-53
CHECKING THE TRANSMISSION ......................................................... 5-53
INSTALLING THE TRANSMISSION ....................................................... 5-53
.............................................................................................. 5-54
DISASSEMBLING THE CRANKCASE.................................................... 5-56
REMOVING THE CRANKSHAFT ASSEMBLY ....................................... 5-56
CHECKING THE TIMING CHAIN AND TIMING CHAIN GUIDE ............. 5-56
CHECKING THE CRANKSHAFT AND CONNECTING ROD ................. 5-56
CHECKING THE CRANKCASE .............................................................. 5-57
CHECKING THE BEARING AND OIL SEAL........................................... 5-57
CHECKING THE OIL PUMP DRIVE GEAR ............................................ 5-57
CHECKING THE OIL STRAINERS ......................................................... 5-58
INSTALLING THE CRANKSHAFT .......................................................... 5-58
ASSEMBLING THE CRANKCASE.......................................................... 5-59
Summary of Contents for MBK XMAX 2014
Page 1: ...2014 SERVICE MANUAL YP125R YP125RA 2DM F8197 E0 ...
Page 6: ......
Page 8: ......
Page 64: ...TIGHTENING TORQUES 2 17 Muffler tightening sequence 1 2 3 ...
Page 72: ...LUBRICATION SYSTEM DIAGRAMS 2 25 EAS2DM1116 LUBRICATION SYSTEM DIAGRAMS 1 2 3 4 5 3 ...
Page 78: ...CABLE ROUTING 2 31 Steering head front view 1 2 3 4 5 6 8 8 A 7 7 ...
Page 80: ...CABLE ROUTING 2 33 Front brake left side view for YP125R 1 2 2 1 1 2 2 D E A B C ...
Page 82: ...CABLE ROUTING 2 35 Front brake left side view for YP125RA 2 1 1 2 1 2 2 A B D E C ...
Page 92: ...CABLE ROUTING 2 45 Frame right side view 3 2 4 1 2 3 A B 6 5 3 A B 3 3 2 3 3 A A B A B B 3 ...
Page 94: ...CABLE ROUTING 2 47 Engine right side view 6 6 6 6 C D C D D C 10 B 9 5 6 1 2 8 3 4 5 6 7 A ...
Page 98: ...CABLE ROUTING 2 51 Frame left side view C D C D 2 1 E 1 2 D C 6 1 4 5 3 2 1 7 3 2 1 A B ...
Page 100: ...CABLE ROUTING 2 53 Engine left side view 1 1 1 1 1 2 3 4 5 6 7 8 9 7 7 A B A B A B 1 ...
Page 106: ...CABLE ROUTING 2 59 Rear brake right side view 2 2 2 2 2 2 1 1 2 3 A B C 3 ...
Page 110: ...CABLE ROUTING 2 63 ...
Page 228: ...REAR SHOCK ABSORBER ASSEMBLIES AND SWINGARM 4 89 ...
Page 231: ......
Page 291: ...CRANKSHAFT 5 60 a 1 ...
Page 292: ...CRANKSHAFT 5 61 ...
Page 302: ...WATER PUMP 6 9 ...
Page 313: ......
Page 331: ...CHARGING SYSTEM 8 18 ...
Page 349: ...COOLING SYSTEM 8 36 ...
Page 391: ...FUEL PUMP SYSTEM 8 78 ...
Page 400: ...IMMOBILIZER SYSTEM 8 87 a Light on b Light off ...
Page 401: ...IMMOBILIZER SYSTEM 8 88 ...
Page 405: ...ABS ANTI LOCK BRAKE SYSTEM for YP125RA 8 92 ...
Page 439: ...ABS ANTI LOCK BRAKE SYSTEM for YP125RA 8 126 ...
Page 464: ...ELECTRICAL COMPONENTS 8 151 ...
Page 476: ......
Page 477: ......
Page 478: ......