![background image](http://html1.mh-extra.com/html/xyz-machine-tools/trak-2op-m11-mill/trak-2op-m11-mill_safety-installation-maintenance-service-and-parts-list_3848763007.webp)
3
XYZ Machine Tools Ltd
TRAK
2
OP
Installation, Maintenance, Service & Part List Manual
Warning
Pull studs come in a wide variety of designs, however they often look similar and appear to be
interchangeable, but they are not. Use only the knob that the 2 OP mill is designed to use. The use of the
incorrect knob, or the incorrect usage of a knob, may result in injury or equipment damage. To ensure
the correct knob is chosen, please refer to section 2.4.4 of this manual.
1.2
Safety Information Regarding Unpacking the Machine
Please refer to the installation information in section 3
1.3
Safety Information Regarding Moving the Machine On the Pallet Truck
WHEN MOVING THE MACHINE, THE FOLLOWING CONDITIONS MUST BE SATISFIED
:
1.
Machine moving must only be done by employees who are competent in pallet truck use.
2.
The floor must be structurally rated to support the machine (total machine weight without any
accessories is approximately 1200kg).
3.
The floor must be relatively flat and with a maximum slope not to exceed 20mm per metre
anywhere along the transportation path.
4.
Any steps, gaps or cracks in the floor, must be less than 10mm high, wide, or deep.
5.
The minimum door opening for machine to go through is 815 x 2390 mm.
6.
Clear a 1250mm wide path for transportation prior to actually moving the machine.
Ensure no one is in front, behind or to the side of the machine when it is on the pallet truck whether
stationary, or being moved.
TO MOVE THE MACHINE, PLEASE FOLLOW THE STEPS BELOW:
1.
Move the X-axis to the approximate centre; the Y-axis all the way toward the door (front) until
the (soft) limit is reached; and the Z-axis down until the (soft) limit is reached.
2.
Power down, and disconnect the electrical power cable, compressed air hose, and any other
accessory cables/hoses connected to the machine
3.
Coil up any cables/hoses remaining connected to the machine and attach securely to the
machine, clear of the floor.
4.
Check to make sure that the floor is free of any objects which may obstruct the movement of
the pallet jack wheels or the machine along its transportation path.
5.
Roll the pallet jack under the machine, as far as possible. Make sure the trolley jack forks are
aligned with the “Lift Here” labels to ensure the machine is properly balanced. See figure 1.5
6.
The machine is actually more stable when lifted from the front or rear, so this is preferred to a
side pick up.
7.
Lift the machine about 12 – 15mm off the floor. While pulling, pushing and steering the pallet
jack, monitor the movement of the machine to make sure that it does not run into or catch on
anything during transportation. Carefully move the machine to the new location.
WARNING:
Avoid making sudden or sharp turns when moving the machine.
8.
Once at the new location, slowly and carefully lower the machine down to the floor, and stow
away the pallet jack.
Summary of Contents for TRAK 2OP M11 Mill
Page 9: ...5 XYZ Machine Tools Ltd TRAK 2OP Installation Maintenance Service Part List Manual...
Page 10: ...6 XYZ Machine Tools Ltd TRAK 2OP Installation Maintenance Service Part List Manual...
Page 11: ...7 XYZ Machine Tools Ltd TRAK 2OP Installation Maintenance Service Part List Manual...
Page 12: ...8 XYZ Machine Tools Ltd TRAK 2OP Installation Maintenance Service Part List Manual...
Page 13: ...9 XYZ Machine Tools Ltd TRAK 2OP Installation Maintenance Service Part List Manual...
Page 130: ...1 14 15 1 8 15 12 15 14...