![XYZ Machine Tools TRAK 2OP M11 Mill Safety, Installation, Maintenance, Service And Parts List Download Page 25](http://html1.mh-extra.com/html/xyz-machine-tools/trak-2op-m11-mill/trak-2op-m11-mill_safety-installation-maintenance-service-and-parts-list_3848763025.webp)
21
XYZ Machine Tools Ltd
TRAK
2
OP
Installation, Maintenance, Service & Part List Manual
Fig. 3.5
Wire a suitable power cable to the incoming isolator in the main electrical cabinet. We recommend:
•
Heavy duty, rubber insulated cable to H07RN-F (or equivalent),
•
Size:
6mm
2
,
•
Conductor:
3 phase and protective earth (no Neutral Conductor),
•
Machine Cable Entry: M32,compression cable gland
•
Plug:
to suit your factory installation (e.g. 32A “Commando” plug).
Connect an air line to the pneumatic input on the rear of the machine
Switch on the machine.
Press the servo on button to enable the axis motors. The message at the top of the screen should change
from SERVO OFF to SERVO ON. Verify the lube pump cycles 1 time when the servos are first turned on.
Select Service Code 505 and use the electronic handwheel to raise the head far enough to remove the
wooden transit support see Fig 3.6.
Summary of Contents for TRAK 2OP M11 Mill
Page 9: ...5 XYZ Machine Tools Ltd TRAK 2OP Installation Maintenance Service Part List Manual...
Page 10: ...6 XYZ Machine Tools Ltd TRAK 2OP Installation Maintenance Service Part List Manual...
Page 11: ...7 XYZ Machine Tools Ltd TRAK 2OP Installation Maintenance Service Part List Manual...
Page 12: ...8 XYZ Machine Tools Ltd TRAK 2OP Installation Maintenance Service Part List Manual...
Page 13: ...9 XYZ Machine Tools Ltd TRAK 2OP Installation Maintenance Service Part List Manual...
Page 130: ...1 14 15 1 8 15 12 15 14...