![background image](http://html1.mh-extra.com/html/xyz-machine-tools/trak-2op-m11-mill/trak-2op-m11-mill_safety-installation-maintenance-service-and-parts-list_3848763058.webp)
54
XYZ Machine Tools Ltd
TRAK
2
OP
Installation, Maintenance, Service & Part List Manual
Fig. 5.4a – Programming Panel
The programming panel has 7 cables that connect to the electrical cabinet. See figure 5.4b. They are as
follows:
1.
E-stop cable:
Connects to the E stop safety relay. If the E stop is not pressed, then the safety
relay should be able to be reset by pressing the servo on button.
2.
Servo On Button: One cable connects to the servo on input port on the computer module; the other
cable connects to the E-stop safety relay. This button must be pressed upon boot up or after an e-
stop condition is resolved.
3.
VGA Cable:
Carries the video signal from the computer module to the LCD controller board.
4.
Com Port Cable: Provides a serial link between the panel and computer module. It carries the non-
critical key signals on the overlay as well as the signal for the beeper. It connects to the com port on
the side of the computer module.
5.
Overlay Power Cable:
Provides power to the panel from the computer module (12VDC, 5VDC and
24 VDC. This cable also carries the following critical keys: AUX, ON, OFF, GO and STOP.
6.
EHW Cable:
Carries the encoder signals from the EHW to the computer module. 6 wires carry
the following signals: power, ground, A, NOT A, B and NOT B.
Summary of Contents for TRAK 2OP M11 Mill
Page 9: ...5 XYZ Machine Tools Ltd TRAK 2OP Installation Maintenance Service Part List Manual...
Page 10: ...6 XYZ Machine Tools Ltd TRAK 2OP Installation Maintenance Service Part List Manual...
Page 11: ...7 XYZ Machine Tools Ltd TRAK 2OP Installation Maintenance Service Part List Manual...
Page 12: ...8 XYZ Machine Tools Ltd TRAK 2OP Installation Maintenance Service Part List Manual...
Page 13: ...9 XYZ Machine Tools Ltd TRAK 2OP Installation Maintenance Service Part List Manual...
Page 130: ...1 14 15 1 8 15 12 15 14...