PROCEDURE
1
Remove the protection from the valve block (003,
).
2
Do a check of the lip seal (002). If necessary replace the lip seal.
3
Make sure that the sealing surfaces of the PCV (001) and of the valve block (003) are
clean and have no damage.
4
Put the PCV (001) in position of the valve block (003).
5
Apply Never-Seez NSBT-8 to the screw threads (008).
6
Put the screws (008) in position in the PCV (001).
7
Torque the screws (008), refer to section
8
Tighten the angle union (006).
9
Connect the electrical connection to the solenoid valve (009).
Fig 10-25 Pressure control valve - install
001
002
003
004
006
003
005
007
008 001
009
CLOSE UP
•
None
X72DF
AA00-5562-00AAA-720A-A
Maintenance Manual
Fuel rail - install the pressure control valve
Winterthur Gas & Diesel Ltd.
- 591 -
Issue 002 2020-10
Summary of Contents for X62DF
Page 881: ...Approved Tightening Instructions Rev I Page 1 14...
Page 882: ...Approved Tightening Instructions Rev I Page 2 14...
Page 883: ...Approved Tightening Instructions Rev I Page 3 14...
Page 884: ...Approved Tightening Instructions Rev I Page 4 14...
Page 885: ...Approved Tightening Instructions Rev I Page 5 14...
Page 886: ...Approved Tightening Instructions Rev I Page 6 14...
Page 887: ...Approved Tightening Instructions Rev I Page 7 14...
Page 888: ...Approved Tightening Instructions Rev I Page 8 14...
Page 889: ...Approved Tightening Instructions Rev I Page 9 14...
Page 890: ...Approved Tightening Instructions Rev I Page 10 14...
Page 891: ...Approved Tightening Instructions Rev I Page 11 14...
Page 892: ...Approved Tightening Instructions Rev I Page 12 14...
Page 893: ...Approved Tightening Instructions Rev I Page 13 14...
Page 894: ...Approved Tightening Instructions Rev I Page 14 14...