12.2.2
Integrated electric balancer - remove the bearing (engine side)
Periodicity
Description
Unscheduled
Duration for performing preliminary requirements
0.0 man-hours
Duration for performing the procedure
0.5 man-hours
Duration for performing the requirements after job completion
0.0 man-hours
Personnel
Description
Specialization
QTY
Engine crew
Intermediate
AR
Support equipment
Description
Part No.
CSN
QTY
Eye bolt
94045
1
Lever chain hoist
94016-008
1
Lifting tool
94704
1
M20 x 140 mm screws
NA
2
Supplies
Description
QTY
Oil
AR
Spare Parts
Description
Part No.
CSN
QTY
None
SAFETY PRECAUTIONS
CAUTION
Injury Hazard: Use the correct equipment to lift and move the bearing. This will prevent
injury to personnel and damage to equipment.
CAUTION
Damage Hazard: Do not remove two bearings at the same time. Damage to the equipment
can occur.
PRELIMINARY OPERATIONS
•
12.2.1 Integrated electric balancer - prepare before the
X72DF
AA00-7758-00AAA-520A-A
Maintenance Manual
Integrated electric balancer - remove the bearing (engine side)
Winterthur Gas & Diesel Ltd.
- 690 -
Issue 002 2020-10
Summary of Contents for X62DF
Page 881: ...Approved Tightening Instructions Rev I Page 1 14...
Page 882: ...Approved Tightening Instructions Rev I Page 2 14...
Page 883: ...Approved Tightening Instructions Rev I Page 3 14...
Page 884: ...Approved Tightening Instructions Rev I Page 4 14...
Page 885: ...Approved Tightening Instructions Rev I Page 5 14...
Page 886: ...Approved Tightening Instructions Rev I Page 6 14...
Page 887: ...Approved Tightening Instructions Rev I Page 7 14...
Page 888: ...Approved Tightening Instructions Rev I Page 8 14...
Page 889: ...Approved Tightening Instructions Rev I Page 9 14...
Page 890: ...Approved Tightening Instructions Rev I Page 10 14...
Page 891: ...Approved Tightening Instructions Rev I Page 11 14...
Page 892: ...Approved Tightening Instructions Rev I Page 12 14...
Page 893: ...Approved Tightening Instructions Rev I Page 13 14...
Page 894: ...Approved Tightening Instructions Rev I Page 14 14...