13.3.8
HP fuel pipe (fuel pump to fuel rail) - install
Periodicity
Description
Unscheduled
Duration for performing preliminary requirements
0.0 man-hours
Duration for performing the procedure
0.5 man-hours
Duration for performing the requirements after job completion
0.0 man-hours
Personnel
Description
Specialization
QTY
Engine crew
Intermediate
1
Support equipment
Description
Part No.
CSN
QTY
None
Supplies
Description
QTY
Never-Seez NSBT
AR
Spare Parts
Description
Part No.
CSN
QTY
O-rings
HA1-58-8752-02 -006
pc 8
HP fuel pipe
HA1-58-8752-01 -002
pc 1
HP fuel pipe
HA1-58-8752-01 -004
pc 1
HP fuel pipe
HA1-58-8752-01 -006
pc 1
HP fuel pipe
HA1-58-8752-01 -008
pc 1
SAFETY PRECAUTIONS
CAUTION
Use approved equipment or sufficient personnel to lift and move the HP fuel pipe.
PRELIMINARY OPERATIONS
•
None
X72DF
AA00-8752-00AAA-720A-A
Maintenance Manual
HP fuel pipe (fuel pump to fuel rail) - install
Winterthur Gas & Diesel Ltd.
- 764 -
Issue 002 2020-10
Summary of Contents for X62DF
Page 881: ...Approved Tightening Instructions Rev I Page 1 14...
Page 882: ...Approved Tightening Instructions Rev I Page 2 14...
Page 883: ...Approved Tightening Instructions Rev I Page 3 14...
Page 884: ...Approved Tightening Instructions Rev I Page 4 14...
Page 885: ...Approved Tightening Instructions Rev I Page 5 14...
Page 886: ...Approved Tightening Instructions Rev I Page 6 14...
Page 887: ...Approved Tightening Instructions Rev I Page 7 14...
Page 888: ...Approved Tightening Instructions Rev I Page 8 14...
Page 889: ...Approved Tightening Instructions Rev I Page 9 14...
Page 890: ...Approved Tightening Instructions Rev I Page 10 14...
Page 891: ...Approved Tightening Instructions Rev I Page 11 14...
Page 892: ...Approved Tightening Instructions Rev I Page 12 14...
Page 893: ...Approved Tightening Instructions Rev I Page 13 14...
Page 894: ...Approved Tightening Instructions Rev I Page 14 14...