![WinGD X62DF Maintenance Manual Download Page 213](http://html1.mh-extra.com/html/wingd/x62df/x62df_maintenance-manual_986574213.webp)
14.7
Turn the rod (001) back to release the tension in the spring (006). Make sure
that the valve cotter (003) is installed correctly in the spring carrier (012).
14.8
Remove the dismantling and assembling tool and the bracket from the bush
(007).
15
Do the test procedure given in
again.
16
If the leakage is unsatisfactory, replace the valve spindle and valve guide.
CLOSE UP
•
None
X72DF
AA00-2140-00AAA-362A-A
Maintenance Manual
Gas admission valve - do a check for gas leakage
Winterthur Gas & Diesel Ltd.
- 213 -
Issue 002 2020-10
Summary of Contents for X62DF
Page 881: ...Approved Tightening Instructions Rev I Page 1 14...
Page 882: ...Approved Tightening Instructions Rev I Page 2 14...
Page 883: ...Approved Tightening Instructions Rev I Page 3 14...
Page 884: ...Approved Tightening Instructions Rev I Page 4 14...
Page 885: ...Approved Tightening Instructions Rev I Page 5 14...
Page 886: ...Approved Tightening Instructions Rev I Page 6 14...
Page 887: ...Approved Tightening Instructions Rev I Page 7 14...
Page 888: ...Approved Tightening Instructions Rev I Page 8 14...
Page 889: ...Approved Tightening Instructions Rev I Page 9 14...
Page 890: ...Approved Tightening Instructions Rev I Page 10 14...
Page 891: ...Approved Tightening Instructions Rev I Page 11 14...
Page 892: ...Approved Tightening Instructions Rev I Page 12 14...
Page 893: ...Approved Tightening Instructions Rev I Page 13 14...
Page 894: ...Approved Tightening Instructions Rev I Page 14 14...