37
Operate the lever chain hoists (006, 007) to lift the bearing cover (004) into position on
the crank pin.
38
Put the round nuts (010) on the elastic studs.
39
Use a round bar to tighten equally the round nuts (010).
40
Measure the distance (X1, X2) between the edges of the bearing shells (002, 003) and
the bearing cover (004).
41
For new bearing shells, the dimensions X1 plus X2 must be between 1.18 mm and
1.34mm.
42
Tighten the round nuts (010), refer to section
4.2 Tighten a round nut with a pre-
X72DF
AA00-3303-03AAA-720A-A
Maintenance Manual
Connecting rod - install the bottom end bearing
Winterthur Gas & Diesel Ltd.
- 416 -
Issue 002 2020-10
Summary of Contents for X62DF
Page 881: ...Approved Tightening Instructions Rev I Page 1 14...
Page 882: ...Approved Tightening Instructions Rev I Page 2 14...
Page 883: ...Approved Tightening Instructions Rev I Page 3 14...
Page 884: ...Approved Tightening Instructions Rev I Page 4 14...
Page 885: ...Approved Tightening Instructions Rev I Page 5 14...
Page 886: ...Approved Tightening Instructions Rev I Page 6 14...
Page 887: ...Approved Tightening Instructions Rev I Page 7 14...
Page 888: ...Approved Tightening Instructions Rev I Page 8 14...
Page 889: ...Approved Tightening Instructions Rev I Page 9 14...
Page 890: ...Approved Tightening Instructions Rev I Page 10 14...
Page 891: ...Approved Tightening Instructions Rev I Page 11 14...
Page 892: ...Approved Tightening Instructions Rev I Page 12 14...
Page 893: ...Approved Tightening Instructions Rev I Page 13 14...
Page 894: ...Approved Tightening Instructions Rev I Page 14 14...