Fig 8-36
Top end bearing - move
I
II
II
I
002
003
004
001
005
006
007
003
004
008
009 010
00766
18
Operate the lever chain hoists (003 and 007,
) to move the connecting rod to
the vertical position.
19
Make sure that the platform (006) is installed.
20
Operate the chain blocks (008, 009) to lift the crosshead (002) a small distance.
21
Remove the two supports (004).
22
Operate the chain blocks (008, 009) to lower the crosshead into position on the
connecting rod.
23
Attach the toggle lever (001) to the connection piece on the crosshead (002).
X72DF
AA00-3303-02AAA-720A-A
Maintenance Manual
Connecting rod - install the top end bearing
Winterthur Gas & Diesel Ltd.
- 422 -
Issue 002 2020-10
Summary of Contents for X62DF
Page 881: ...Approved Tightening Instructions Rev I Page 1 14...
Page 882: ...Approved Tightening Instructions Rev I Page 2 14...
Page 883: ...Approved Tightening Instructions Rev I Page 3 14...
Page 884: ...Approved Tightening Instructions Rev I Page 4 14...
Page 885: ...Approved Tightening Instructions Rev I Page 5 14...
Page 886: ...Approved Tightening Instructions Rev I Page 6 14...
Page 887: ...Approved Tightening Instructions Rev I Page 7 14...
Page 888: ...Approved Tightening Instructions Rev I Page 8 14...
Page 889: ...Approved Tightening Instructions Rev I Page 9 14...
Page 890: ...Approved Tightening Instructions Rev I Page 10 14...
Page 891: ...Approved Tightening Instructions Rev I Page 11 14...
Page 892: ...Approved Tightening Instructions Rev I Page 12 14...
Page 893: ...Approved Tightening Instructions Rev I Page 13 14...
Page 894: ...Approved Tightening Instructions Rev I Page 14 14...