7.10
Pilot injection valve
7.10.1
Pilot injection valve - remove
Periodicity
Description
Working hours
24 000
Duration for performing preliminary requirements
0.0 man-hours
Duration for performing the procedure
1.0 man-hours
Duration for performing the requirements after job completion
0.0 man-hours
Personnel
Description
Specialization
QTY
Engine crew
Basic
AR
Support equipment
Description
Part No.
CSN
QTY
Plate
94270E
1
Stud bolt
94270F
2
Supplies
Description
QTY
None
Spare Parts
Description
Part No.
CSN
QTY
None
SAFETY PRECAUTIONS
WARNING
Danger: Do not weld or grind materials in the area. The sparks from welding equipment
and grinding tools can cause a fire.
PRELIMINARY OPERATIONS
•
The engine must be stopped and made safe for maintenance, refer to section
maintenance work - general procedure
•
The engine must become cool before you do work.
X72DF
AA00-2790-00AAA-520A-A
Maintenance Manual
Pilot injection valve - remove
Winterthur Gas & Diesel Ltd.
- 326 -
Issue 002 2020-10
Summary of Contents for X62DF
Page 881: ...Approved Tightening Instructions Rev I Page 1 14...
Page 882: ...Approved Tightening Instructions Rev I Page 2 14...
Page 883: ...Approved Tightening Instructions Rev I Page 3 14...
Page 884: ...Approved Tightening Instructions Rev I Page 4 14...
Page 885: ...Approved Tightening Instructions Rev I Page 5 14...
Page 886: ...Approved Tightening Instructions Rev I Page 6 14...
Page 887: ...Approved Tightening Instructions Rev I Page 7 14...
Page 888: ...Approved Tightening Instructions Rev I Page 8 14...
Page 889: ...Approved Tightening Instructions Rev I Page 9 14...
Page 890: ...Approved Tightening Instructions Rev I Page 10 14...
Page 891: ...Approved Tightening Instructions Rev I Page 11 14...
Page 892: ...Approved Tightening Instructions Rev I Page 12 14...
Page 893: ...Approved Tightening Instructions Rev I Page 13 14...
Page 894: ...Approved Tightening Instructions Rev I Page 14 14...